company-profile-module $!{companyProfile}

High Efficient Gold Gravity Concentration Small Gold Mine Processing Plant

  • 1 - 2 Sets
    $30,000.00
  • >=3 Sets
    $10,000.00
Model Number:
Rock Gold Processing Plant
Power:
based on the models
Inventory Status:
In Stock
Lead time:
Quantity(Sets) 1 - 1 >1
Lead time (days) 31 Negotiable
Customization
Graphic customization (Min. Order: 1 Sets)
Customized packaging (Min. Order: 1 Sets)

More

Customized logo (Min. Order: 1 Sets) Less
Report abuse
Overview
Essential details
Type:
Gravity Separator
Production Capacity:
1-500tph
Place of Origin:
Jiangxi, China
Brand Name:
WALKER/JXSC
Voltage:
380V or customized
Dimension(L*W*H):
depends
Weight:
5000 KG
Warranty:
1 Year
Machinery Test Report:
Provided
Video outgoing-inspection:
Provided
Core Components:
Motor
Key Selling Points:
High Rigidity
Product name:
Rock Gold Processing Plant
Material:
Mn13Cr2/Mn18Cr2
Color:
Customized Painted
Local Service Location:
Indonesia
After-sales Service Provided:
Field maintenance and repair service
Installation:
Under Guidance
Recovery rate:
98%~99%
Quality:
High Reputation
Price:
Negotiable
Factory Visit:
Welcomed Warmly
Packaging & delivery
Lead time :
Quantity(Sets) 1 - 1 >1
Lead time (days) 31
Video Description
Product Description

Overview

Gravity gold processing is the most traditional method of extracting gold in rock gold mine used widely. It is more as a secondary process to recover coarse gold in the grinding circuit to create favorable conditions for the flotation and cyanidation. Because of its efficiency in capturing single coarse gold, so for placer gold extraction, the process is also in dominant position.

Features

1. The process is simple, low cost, effective for capture single coarse gold 2. Improving beneficiation indicator and overall recovery rate of gold, increase production and reduce the cost.

Widely Used Rock Gold Solution 1:

Hard-Rock Gold Mining Use Jaw Crusher + Hammer Crusher + Shaking Tables
1. Jaw Crusher as the primary crusher and Hammer Crusher as the secondary crusher to crusher gold rocks to get sized fine ore for further processing. 2 It is configured with trough feeder to give materials to a jaw crusher, after jaw crusher grind materials size to be small to hammer crusher .hammer crusher grind materials to be fine then to shaking table to recover gold. 3. The trough feeder it can feed evenly to the crusher. 4. The jaw crusher Preliminary crushing of large stones also can be made mobile type as per request. 5. The hammer crusher the output size is adjustable like 10mm,5mm, etc. for this project it’s grind materials to 0-2mm. also can be made mobile type as per request. 6. The shaking table is gravity to recovery gold .with very high recovery rate and It is very friendly to the environment 7. This Plant also can be used for Hard Rock Tin ore/ Coltan ore/ Tungsten Ore/ Chrome 8. The capacity for this process plant can be customized as per request such as 10tph, 20tph,50tph,100tph, etc


Widely Used Rock Gold Solution 2:

Hard-Rock Gold Mining Via Ball Mill + Shaking Tables
1. Loader or Excavator feed raw ore into the hopper; 2. Vibrating feeder feed primary jaw crusher; primary jaw crusher is to crush big stone to medium size. 3. Output of primary crusher sent to fine jaw crusher by belt conveyor; fine jaw crusher is to crush medium sized stone to small size. 4. Output of fine jaw crusher sent to vibrating screen by belt conveyor; 5. Oversized rock is back to fine jaw crusher for further crushing by belt conveyor; 6. Undersized materials sent to one transit ore bin by belt conveyor; 7. Fine ore in transit bin is sent to ball mill via electromagnetic vibrating feeder+belt conveyor. ball mill is to grind ore to powder size. 8. Discharge of ball mill goes to spiral classifier for roughly size separation. Coarse particles will be back to ball mill for further grinding; 9. Fine particles will be sent to the centrifugal concentrator for concentrating fine gold by a slurry pump. 10. Tailings of centrifugal concentrator go to sluice box for recovering more gold; 11. Concentrates of sluice box and centrifugal concentrator are sent to shaking table for fine concentrating gold. The ball mill + classifier forms a closed-circuit grinding system, which can achieve more than 90% of the discharge to 200 mesh(0.074mm) So this flowchart is very suitable for recovering fine powder gold in rocks.


Widely Used Rock Gold Solution 3:

Hard-Rock Gold Mining With Wet Pan Mill + Shaking Tables
1. hopper+vibration feeder: raw materials will feed into the hopper by truck or excavator as you want,then the materials will feeded into the jaw crusher by the vibration feeder automatically. 2. jaw crusher: jaw crusher is uesd to crush the rock gold ore, different model of the jaw crusher is with different input size,discharge size and capacity.the model of the jaw crusher is chosed based on the ore size and the capacity you want to process,big ore size need big model and more cost. 3. belt conveyor: belt conveyor is used transport the discharge from the jaw crusher to the hopper,it works automatically,will save much manual work.and the length and width can be customized as you requested. 4. hopper+trough feeder: there are two functions of the hopper and trough feeder a.make the feeding work to each machine more smoothly.when you feed the materials to the jaw crusher,it will takes some time to get the discharge,the machines behind the jaw crusher will work for nothing at that time,means waste power and release the capacity of the machines behind the jaw crusher.if you add the hopper and trough feeder, each machine can runs better. b.used to stock the discharge from the jaw crusher.sometimes the ore size maybe big, you need to use a big jaw crusher with big capacity.but you just want to start with a small capacity,then you can add the hopper and trough feeder to stock the discharge from the jaw crusher, and you can chose the hammer crusher with a small capacity behind the jaw crusher,no need to match the capacity with the jaw crusher.when the hopper is full, you can stop the jaw crusher.will save more power. 5 .belt conveyor:belt conveyor is used transport the discharge from the hopper to the hammer crusher,it works automatically,will save much manual work.and the length and width can be customized as you requested. 6. hammer crusher: hammer crusher is used to small the discharge from the jaw crusher, because the feeding size of the wet pan mill is 0-25mm.the discharge from the jaw crusher hard to meet the needs of the wet pan mill. the hammer crusher can do work successfully, there is a sieve under the hammer crusher and the sieve size can be customized as you want, minimum sieve size can be 2mm,the smaller size you feed into the wet pan mill, the more efficent work you will get. 7. wet pan mill: for the rock gold ore, sometimes the gold can be released under the size 0-2mm or 0-1mm or 0-200mesh.these output size will need different machines and also depends on the ore condition.if you need to grind the ore to 0-1mm, you may need the wet pan mill. 8. shaking table: the shaking table is used to get the gold concentrate from the raw materials.when you add the water and materials to the shaking table, the gold will be separated from other stones and minerals which the gravity is lower than the gold. 9. gold smelting furnace: the gold concentrate from the shaking table can be smelted to the gold bar by the gold smelting furnace.will easy to carry the gold and in case of missing. Notes: the wet pan mill and shaking table will need water when works, you can also add water to the hammer crusher,in case blocking the sieve of the hammer crusher.the machines in the video are just for you reference, need to reconfirm based on the ore condition you provide.


We have professional engineers team to draw flowchart based on customer's gold mine site details.
We supplied full set gold plant: vibrating feeder, jaw crusehr, hammer crusehr, gold centrifugal concentrator, wet pan mill, sluice box and shaking table.
Successful cases


300TPD(12TPH) Rock Gold CIP Processing Plant in Kenya

WALKER has provided a successful 300TPD(12TPH) rock gold CIP processing plant in Kenya. We design the CIP gold plant process flowchart & plant layout drawing according to ore conditions, provide a complete set of plant machines and send Chinese engineers to the mine site for plant installation & commissioning guidance. Make this gold CIP project installed successfully and satisfied with the customer.
This complete CIP gold process plant includes a feeding machine, jaw crushers, fine jaw crusher, belt conveyor, vibration screen, ball mill, thickener, leaching & adsorption agitation tanks, desorption electrolysis system, tailing water recycle system, and all the other needed accessories. The crushing plant is for crushing big rocks to a smaller size(0-20mm), then feeding to ball mill grinding to 200 mesh, then make 200 mesh slurry material to suitable pulp concentration by thickener. Concentrate ore from thickener will go to leaching tanks and adsorption agitation tanks and put activated carbon in adsorption tanks to absorb gold. After eluting the gold-loaded carbon, the precious liquid enters the desorption electrolysis equipment to enrich the gold mud. After drying the gold mud, smelt it into gold bars. The Gold CIP plant has a very high recovery ratio for oxide & sulfide type gold. It is currently an internationally popular gold beneficiation technology, also the trend of gold beneficiation development.

300TPD(12TPH) Rock Gold CIP Processing Plant Flowchart


Rock Gold Processing Plant in Tanzania

The plant including : Jaw crusher, wet pan mill and shaking table. Capacity: 1-2TPH We have our engineer there for commisioning and installation guidance.
Packing & Delivery

●Ways Of Packing

1.Small parts packed in the wooden cases. 2.Big parts packed by plastic membrane. 3.The whole big machine is loaded in the container.

● Shiping by sea/air freight

or any way the customer requires.
Company Introduction
Jiangxi walker Machinery Co.,Ltd, are a professional manufacturer of complete set mining equipments, a sub-company of JXSC mine machinery factory in Jiangxi province.professional at providing complete set processing equipments for Gold ore /Tin ore /Tungsten ore /Iron ore / Diamond/ Coltan ore / Silica sand / Zircon sand/ Black sand/Chrome ore, ect. As well as complete set small lab mining machines.

Our core advantages as below:
1.+30years history factory at mining machinery
2.Provide engineer team after sale service
3.Provide complete set mineral processing plant
4.Provide sample testing service in factory lab for free
5.Provide professional ming soolution consulting
Customers visit and Exhibitions
1.Inquiry and consulting support.
2.Ore sample testing support.
3.View our Factory.
4.Design Flowchart.
1.Training how to instal the machine, training how to use the machine.
2. 1 year warranty .
3.Engineers available to service machinery overseas.
FAQ
Pre-sales service: We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.

Sales service: Send technicians to the site to guide the installation and commissioning, train the operators, and complete the acceptance with you.

After-sales service: To establish long term friendship, we will regularly pay return visit to customers. Supplying technique, building design, instruction, installation and debugging for free.

Lifelong service: One year warranty to make sure your machine runs constantly.Always offer lifelong service and provide spare parts for a long term.

How is the quality of your products?
Answer: Our products are manufactured strictly according to national and international standard, and we will take a test on every grinder before delivery.

How about the Guaranteed?
Answer: All of our products are guaranteed for one year. If products quality is not consistent with the description as we
described or the promise before you place order, we promise 100% refund.

●How about price?

Answer: For the complete same machine, we can promise our quality is the best when the price same as other competitors, and our price can be lowest when the quality at standard level.

How about the service and payment terms?
Answer: We can accept T/T or other payment ways you request; 30% deposit, 70% balance before delivery, which is international trade practice; Finished product pictures will provide to customers before delivery.